4. No liner under stone work and no steel work
in waterfall construction created this large crack.
5. Site for
filtration, pump and uv equipment.
6. Example of collected waste on floor of
the pond. Note gravel on the floor intesifies waste build up.
Blackened floor of pond on the right is anaerobic bacterial growth
- to be avoided.
7. Classic example of the results of the organic
debris left on the bottom of the pond. This photo was taken within
5 minutes of vacuming up the waste on the floor. Blackened area
is anaerobic growth; once exposed to air it dies off within 20-30
minutes. See photo # 12 on Page 2.
8. Beginning stages of exposed surface plumbing added.
Intake screens #C267 used here.